Last updated on  30 June 2014

 

Photos of GB Meeting Amravati <<<>>>

 

PHOTOs of Interactive Session at RTCC Pune <<<>>>

 

30 June 14: SNEA (I) MH whole heatedly Congratulates Com. P.N. Asodekar, DE (Int) Jalgaon & Ex President SNEA(I) Jalgaon, Com. R.R. Rai, JTO LC & CECM SNEA(I) Mumbai, Com. Kedar Yadav, AD Trg Mumbai on their superannuation retirement today & wish them and their  family members "A very Happy peaceful& Long Retired life”.

           Comrades, today SNEA(I) MH has to give farewell its two stalwart comrades, namely Com. P.N. Asodekar & Com. R.R.Rai, who are the pillars for strong unity respectively on platform of SNEA Jalgaon & SNEA(I) Circle Office Mumbai and in no way we will get their substitute in association activities.

Com. Prakash Namdeo Asodekar, DE Int Jalgoan, {9422605225} has started his carrier as Technician in DoT Mumbai in 1979 and in 1981 he was selected as JE outsider and posted in Mumbai itself. On his request, he joined Jalgaon SSA as JTO in 1991 and was promoted as SDE in 1994. In SDE cadre he has served in Ahmednagar SSA & Dhule SSA in different capacities. Since 2008, he continues his services in Jalgaon SSA in different capacities of DE. Com. Asodekar is known for his soft spoken language, helping nature, cordial staff relations, efficiency in office working. Since long he is member of SNEA (I) and has contributed his best for SNEA (I). Com. Asodekar is one of SNEA (I) leaders who have taken sincere, dedicated & day night efforts for memorable, historical & highly successful Circle Conference 2009 of SNEA (I) Maharashtra Circle held at Jalgaon. Com. Asodekar has firm belief on SNEA (I) activities and was always instrumental in framing guidelines for functioning of SNEA (I) Jalgaon as well as for SNEA (I) Maharashtra Circle. He has rendered his services as President of SNEA (I) Jalgaon for continuous four years and during this period SNEA (I) has grown up like anything and today membership has been doubled. He is instrumental in building overall strength of SNEA (I) in Jalgaon SSA and is guiding force for one and all. Today when he retires after completion of 35 years of devoted services to DoT & BSNL, SNEA (I) MH salutes & recognizes his dedication & contribution towards SNEA (I) and we will definitely miss him in overall functioning of SNEA (I). 

Com. Ramashray Rajdev Rai, JTO LC Mumbai {9423992406} has started his carrier in 1979 as Time Scale Clerk in CTO Mumbai wherein he has skillfully handled Public Counter for long time. In 2004 he was promoted as JTO and since then he is working in Circle office Mumbai. He has served in capacity of PRO Mumbai, wherein he was instrumental in resolving many of the issues through his PR skills. In capacity of JTO LC, he has major contribution in persuasion for provision of Lease Circuits throughout Maharashtra, its billing and recovery of the outstanding amount. He has successfully managed his office work as well association activities. Com. Rai is one of the founder members of SNEA (I) Circle Office Mumbai branch which was formed in 2007 and he started his association carrier as Treasurer, SNEA (I) Mumbai. In 2010 he was unanimously elected as District Secretary of SNEA (I) Mumbai and since 2013 he is CEC Member from SNEA (I) Mumbai. When he laid foundation of SNEA (I) Mumbai branch, its membership was just 11 and with his tireless and dedicated leadership, today membership of SNEA (I) Mumbai has crossed figure of 260 members, which is second largest in Maharashtra Circle. He has participated in each and every activity of SNEA (I) and always played vital role in overall functioning of SNEA (I) Maharashtra Circle. He was sincere and devoted to all association activities and has never missed any CEC Meetings, Circle & All India Conferences, and different meetings with senior officers of BSNL including CGMT MH Circle. By his active & studied participation in different meetings, he has framed different guidelines for betterment of executive community in BSNL Maharashtra Circle. He is known for his orator skills and mobilizing capacity as leader. He has always played important role in building unity among Mumbai comrades on platform of United/Joint Forum. Today after long services of 35 years of bright services to DoT & BSNL, he is retiring on superannuation from BSNL services. SNEA (I) salutes his dedication and devotion towards SNEA (I) & BSNL and recognizes his contribution for SNEA (I) comrades.

Com. Kedar Yadav, AD TRG Mumbai {9423086700} has joined duties as Time Scale Clerk in WTR Mumbai during 1976. In 1993 he was promoted as JTO and posted in Raigad SSA at rendered his dedicated services in different capacities including SDE Karjat. Since 2005 he is posted in Circle office Mumbai and has served as AD NC, Admn and presently is serving as AD TRG Mumbai. He is die-hard Member of SNEA (I) since Raigad SSA and has always made major contribution in functioning of SNEA (I). Com. Kedar Yadav is known for his low profile leaving, high thinking standards, helping nature and cordial relations with staff & fellow officers. Today, he is retiring from his long and spotless 39 years services in DoT and BSNL.

SNEA(I) MH salutes sincerity, dedication and affection Com. P. N. Asodekar, Com. R.R.Rai & Com. Kedar Yadav towards BSNL and SNEA(I) and on behalf of thousands of Comrades of SNEA(I) Maharashtra Circle wish them and their family members “A Happy, Peaceful & Long Retired Life”.

 

30 June 14: AGM (Staff) Mumbai issued orders for DGM L/A arrangements of in respect of seven DEs posting them in same SSA. Letter <<<>>>  Corrigendum <<<>>>

           It is seen that out of 14 eligible DEs about 7 DEs have submitted their refusal for DGM L/A arrangements and hence there are chances for additional DGM L/A orders as many of DGM post are vacant throughout Maharashtra Circle. This time Circle Office has made best ever basic level preparations as willingness are called before posting orders and orders are issued as per willingness of the officers and mainly for posting all officers in same SSA, thus reducing good amount of BSNL money on transfer grants in such temporary arrangements and delay in process of accepting refusals and actual joining of officers as DGM L/A. Hope this transparency and positive approach by Circle management continues in all other HR issues.  

 

 30 June 14: AGM (Estt) Mumbai calls for VCs as on 08/07/2008 of 13 SDEs promoted under competitive quota on successfully qualifying LDCE 2007, which is required for finalisation of seniority list in SDE cadre.  Letter <<<>>>

 

28 June 14: AGM (IT) Mumbai writes to all SSA/Unit Heads in Maharashtra Circle for carrying out audit of all IT systems working in their SSA/Unit with action taken report within period of three days.  Letter <<<>>>

 

28 June 14: Add GM NWP CFA Mumbai nominated names of members of Core Team  along with list of SSA & Circle Co-ordinators for implementation of NGN project in Maharashtra Circle.  Letter <<<>>>

 

27 June 14: As per orders, now the works of reimbursement of personal claims of staff & officers in Circle Office Mumbai through ERP will be taken care by one separate AD, as Com. L.K. Kasale, is posted as AD Admn IV exclusively for this work. More than 4000 personal claims are pending in ERP and this matter was taken up by SNEA (I) Mumbai with Shri. Praveen Malhotra, Sr GM HR/Admn Mumbai, wherein he has assured to post separate AD for same. With this order, all personal claims viz, Telephone Bills, Residential News Paper Bills, Mobile hand set & brief case reimbursement etc of the staff & officers working in Circle Office Mumbai which are pending in ERP for long time will now be settled without delay. Letter <<<>>>

 

27 June 14: By endorsing letter written by CMD BSNL, Shri. Praveen Malhotra, Sr GM HR/Admn Mumbai writes SSA Heads in Maharashtra Circle for proper implementation of Field Performance Monitoring System (FPMS) in Maharashtra Circle and its compliance thereof. He also calls for reasons for poor implementation of FPMS system. Letter <<<>>>

 

27 June 14: By endorsing letter written by Director EB BSNL, Shri. Praveen Malhotra, Sr GM HR/Admn Mumbai writes SSA Heads in Maharashtra Circle for proper implementation of Individual Performance Management System (IPMS) in Maharashtra Circle and its compliance thereof. Letter gives brief idea about methodology to be adopted in implementation of IPMS as well as its linkage to APRs of each and every executives and grading of APR by controlling officer on scoring of IPMS Score card. Letter <<<>>>

 

26 June 14: DPE issued clarification regarding Introduction of Pension Scheme and Post Superannuation Medical Benefits in CPSEs. Letter <<<>>>

 

26 June 14: CS SNEA (I) Maharashtra Circle writes to CMD BSNL in support of SNEA(I) Kerla comrades, who are on “Indefinite Hunger Strike” since 25/06/2014. 5. Letter <<<>>>

 

26 June 14: AGM DPC BSNL CO issued list of 3978 SDEs promoted under vacancy years 2006-2007 to 2008-09 under Seniority Cum Fitness quota and called for Errors & Omissions if any. Letter <<<>>>

 

26 June 14: Meeting with PGM (BW): GS and both AGSs met PGM (BW) Sri A. K. Gupta and discussed the following issues.

a.    LDCE promotion from JTO(C) to SDE(C) and considering the request transfers in the cadre of SDE(C): Assn requested to issue the promotion orders at the earliest and consider all the request transfers along with the promotion orders. PGM assured that all the requests will be considered and BW section is trying to issue the promotion orders within a fortnight.

b.    SDE(C) to EE(C) promotion: The DPC is over and the proposal is sent to the competent authority for approval. Out of 72 vacancies, DPC for 48 completed as a first step and remaining posts will be filled after that.

c.     Seniority list of JTOs: PGM informed that seniority list already available and after the promotions, the matter will be examined.

 

25 June 14: AGM (Estt)  Mumbai calls for Special Reports, Assessment Sheet & VCRs of 150 TTAs for JTO Officiating Promotions scheduled from 07/07/2014. It is observed that each time the orders for JTO (Offg) are delayed for want of reports from different units and hence all DS, CoBs, activists and concerned officers are requested to look into matter personally and see that all these reports are sent to AD HRD Mumbai so as to reach it latest by 30/06/2014. Letter <<<>>>

 

25 June 14: JTO/JAO, SDE/AO Pay Scale: GS Com K Sebastin, President Com G L Jogi and AGSs Com Arvind Dahiya and Com. Vivek Wankhede met the concerned officers in DPE and discussed the issue. The reference from DoT for approval of intermediary pay scales of E1A and E2A reached DPE. During discussion we pointed out that earlier references from other Ministries for intermediary pay scales were rejected by DPE and directed concerned ministries/CPSUs to follow standard pay scales. Concerned officers informed that DPE will maintain the same stand taken earlier and assured positive action. GS and President already met Secretary/DPE and Joint Secretary/DPE on 26.02.2014 on the issue and both of them assured at that DPE will not approve any intermediary pay scales. Further SNEA (I) written to Secretary/DPE in this regard on 17.06.2014 to reject the proposal of intermediary pay scales send by DoT. The matter will be processed by DPE in a couple of days.

 

24 June 14: Interactive Session by SNEA & SNATTA for JTO trainees at RTTC PUNE: {Report by Com. Virendra Choudhary JS Pune SNEA(I) MH}: A glorious Interactive session was arranged with trainee JTOs at RTCC Pune by SNEA & SNATTA on 18/06/2014 at 1730 hrs. All the trainees undergoing training at RTCC Pune from AP Circle, Punjab Circle and Maharashtra Circle attended and participated in this special meeting with full enthusiasm. Many of Comrades from RTCC Pune, ITPC Pune, DNW Pune & Pune TD also participated in meeting. This function was arranged with the initiatives of Com. Bharat Sonawane Dynamic DS SNEA (I) Pune in support of Com. Prayag Pisal DS SNEA TTA Pune. Com. Padmnabhan Rao, JS South SNEA (I) CHQ who specially arrived for this meeting from Hyderabad was Chief Guest of this function. Com. Tejas Tadsare, Auditor SNATTA CHQ presided over the function.

The following prominent SNEA (I) leaders attended and addressed the Meeting.

1.     Com. Padmanabhan Rao,Jt Secretary South ,SNEA CHQ,

2.     Com Tejas Tadsare, Auditor, SNATTA CHQ,

3.     Com. M. S. Adasul, Circle Secretary, SNEA (I) MH,

4.     Com V.R.Chaudhari, JT Secretary, SNEA (I) MH Pune.

5.     Com Nitin Pohare, Circle Co-ordinator, SNATTA MH Circle,

6.     Com Vijay Kokare DS SNEA(I) ITPC Pune,

7.     Com Sunil Rane, DP SNEA(I) ITPC Pune,

Ø This function was arranged with the initiative of trainees from AP Circle under guidance of Com. Bharat Sonawane, DS SNEA (I)  Pune and SNATTA Leader for awareness among the trainee JTOs, clarifying their doubts about, their future prospect including field training & posting thereafter, change of work & responsibilities thereof, pay scales of JTO Trainees. This meeting was attended by all the JTO Trainees from AP Circle, Punjab Circle& Maharashtra Circle.

Ø The function was well anchored by Com. Bharat Sonawane, DS SNEA (I) Pune in his speech congratulated all the JTO trainees for successfully completing Phase I Training. All the dignitaries on Dias were given a warm welcome by offering bouquets.

Ø Com Rajshekar Reddy, Vice President SNATTA AP Circle, in his welcome address, gave warm welcome to all and congratulated fellow JTO trainees for their sincere and dedicated efforts in completion of Phase-I training. He explained the purpose of this interactive session and appeal to all the trainees to clear their doubts and queries from the SNEA leaders. He also listed some of specific doubts in minds of trainees and requested dignitaries on dais to brief house on these issues.

Ø Com Nitin Pohare, Circle Coordinator SNATTA MH, addressed the trainees by congratulating them for entry in executive cadre. He informed the role of SNEA in allotting training centers and final postings to the trainees according to their choice. He appreciated the work of SNEA leaders especially com Bharat Sonawane, DS SNEA Pune for his valuable contribution during their training phase. He requested all the trainees to be an integral part of SNEA and confirm faith in SNEA for their own future.

Ø Com Tejas Tadsare, Auditor SNATTA CHQ in his address gave warm welcome to all the Trainees and dignitaries on the Dias. He informed about the struggle carried out by SNATTA and the reasons for the prolonged delay for the TTA to JTO promotions. However he said such situation won’t arise in future, as SNEA is there to take care of all the newly joined JTO’s. He thanked SNEA leaders for their support and appeal to all the trainees to be united and work very hard for development of BSNL. He further shared how SNEA has played major role in settlement of issues of outsider TTAs and departmental TTAs and how roadblocks were cleared over the period, due to intervention by SNEA (I) with amicable solutions.

Ø Com V.R. Chaudhari, JS Pune, SNEA (I) MH welcomed all the JTO Trainees and congratulated them for their promotion as JTO’s. He also informed that as a JTO their role will be not restricted to certain work but has to take a lot of responsibility and self initiation. He also explained the role of SNEA in development & HR issues. SNEA is only the association which considers development issues in BSNL. He also stated that issues of SSA, Circle & CHQ are tackled by all our leaders at their respective levels. He thanked the organizers for carrying this interactive session which was very fruitful.

Ø Com. M. S. Adasul, CS SNEA (I) MH, in his style addressed the trainees by quoting various examples. He explained the role of JTO & its importance and also informed them to be very alert and vigil. He congratulated the entire successful trainee JTOs for their efforts. He also explained how SNEA and its veteran leaders have struggled in the past for the upliftment of JTO cadre. He specially mentioned the efforts taken by CHQ leaders, Com G L Jogi, Com W Seshagiri Rao, Com. S.L. Reddy, Com. P. P. Rao for their devotion and contribution in upliftment of executive community. Further he also explained the role of SNEA in formulating various policies and sticking to it well within BSNL guidelines. He also explained the ways of motivation in today’s working scenario. He appreciated the work of DS Pune Com. Bharat Sonawane for his major contribution and initiative in organizing interactive sessions for the previous and present batches, he also appreciated SNATTA for their major role and showing faith in SNEA.

Ø Com. Padmanabhan Rao, Jt Secretary South, SNEA CHQ in his unique style gave a marathon speech. He gave warm welcome and congratulated all the trainees for entry in the executive cadre. He explained the hardships taken by SNEA veteran leaders right from formation of JETA to SNEA .He mentioned crucial works & struggle carried out by SNEA Veteran leaders Com W.Shehagiri Rao & Com G.L.Jogi in upliftment of JTO cadre earlier in DoT & thereafter in BSNL. He further informed about the SNEA’s role in the organization for fighting against corruption giving classic examples of 2G scandal .Further he added the role of SNEA  in developmental activities of BSNL. He appeal to all the comrades to work and perform and to give the best output so that we all of us will be able to get good pay scales in 3rd PRC by 2017. Further in his speech he said, for posting of this batches JTO’s in A.P, CS SNEA (I) AP has already discussed with Administration and assured all the trainees for their posting in SSA of their choices to maximum. Depending upon the working and sanction strength in each SSA in AP circle the posting of JTO’s will be done well within defined policy. He also assured special cases such as critical Medical, spouse and physically handicapped will be considered according to their choices. He clarified all the doubts of the trainees and made this session lively.

Ø This interactive session was then made open to the trainees to raise their queries and doubts. Many doubts were raised by the trainees which were cleared by the dignitaries on the dais.

Ø This session ended with vote of thanks by Com. K. S Prasad, DP SNATTA Hyderabad, who thanked all the organizers and SNEA leaders for their valuable guidance and inspirational speech and making this programme a grand success.

Ø The meeting started at 1730 hrs concluded at 2115 hrs with National Anthem and slogans of unity.

Ø PHOTOS <<<>>>

 

24 June 14: In special approach of transparent working by Circle management, first time in the history of BSNL Maharashtra Circle, willingness from officers eligible for DGM L/A promotions are called by giving exact vacancy position and probable place of posting. Letter <<<>>>

          In earlier case DGM L/A promotions were given in random manner resulting in refusals by many officers and SNEA (I) MH has raised this issue. This time options are called with specific vacancy position wherein total vacancies declared are 17 and options are called from 14 Officers. It seems that vacancy position of Kalyan SSA is missed in the list. It has been clearly mentioned that officers unwilling to accept DGM L/A promotions should submit their unwillingness in writing to AGM Staff Mumbai before issuing of posting orders. The willingness& unwillingness, both are to be submitted by email on prsule@bsnl.co.in to AGM Staff Mumbai by today itself. To avoid further complications and posting at odd locations, all concerned officers should take firm & final decision and submit their acceptance with choice of posting SSA or submit refusal as the case may be.    

 

24 June 14: AGM (Staff) Mumbai issued orders for DGM L/A arrangements thereby promoting 20 DEs as DGM L/A & by posting them where it is as it basis. In same order, Shri. N R Kusumwar promoted as DGM L/A in earlier list and posted as TDM Yavatmal has been reverted to substantive cadre giving reason that he is junior and not coming in seniority list for DGM L/A promotions. These DGM L/A promotions will be effective from 31/03/2014 or from actual date of taking over charge to 17/09/2014. Letter <<<>>>

 

24 June 14: AGM (Estt)  Mumbai calls for VCRs of 17 DEs for L/A arrangements in DGM cadre and last date for submission of VCRs is 26/06/2014. Letter <<<>>>

 

24 June 14: CAO (FC) Mumbai issued for First & Second TBP for total 18 Account officers from retrospectives dates. Letter <<<>>>

 

24 June 14: BSNL CO issued list of Holidays to be observed in BSNL during year 2015. Letter <<<>>>

 

24 June 14: BSNL CO issued guidelines for conveying CPCs for different promotions in AGM and above cadres in different streams  along with benchmark in APR grading required for such promotions. It is important that as per these guidelines the nomination to CPC is changed from individual names of officer to post and henceforth the officer holding that post will be Chairman/Member of said CPC. This will definitely speed up different CPCs over delayed due to prolonged leave or transfers of individual officers. Letter <<<>>>

 

24 June 14: AGM (Admn) Mumbai calls for applications for grant of Book Award for outstanding School going Children of BSNL Employees on the basis of marks obtained in annual Examination during year 2013-14. BSNL employees having basic pay up to Rs. 38,630.00 as on 01/04/2014 can apply for these book awards. Letter <<<>>>

 

24 June 14: AGM (Admn) Mumbai calls for applications for Incentives for Meritorious Students in Class/Board/University Examination during 2013-14. BSNL employees having basic pay up to Rs. 38,630.00 as on 01/04/2014 can apply for the Incentives. Letter <<<>>>

 

24 June 14: Com. K. Sebastin, GS SNEA(I) CHQ writes to CMD regarding the Serious discrimination and anomaly between Executives of Civil/Electrical/ Architecture and Finance wings and request to bring total parity in pay scales between different wings by extending Group B pay scales notionally w.e.f.  01.10.2000 to JTOs (Civil/Electrical/Arch) and AEs (Civil/Electrical/Arch) on lines similar to JAO pay scales. Letter <<<>>>

24 June 14: Com. K. Sebastin, GS SNEA(I) CHQ writes to DIR (HR) regarding Relaxation in the minimum qualifying marks for the LICE to JTO(T) cadre held on 10.06.2013. Letter <<<>>>

 

24 June 14: AGM (OP) CFA Mumbai completes formality by writing letter to SSA heads conveying message from CMD BSNL to upgrade External plant to meet Broadband demand. Letter <<<>>>

             This letter clearly says that the up gradation of external plants is to be carried out from available resources and within allocated funds. This is how; the officers in BSNL are running from responsibilities by putting t on others shoulders. Now days, it has become fashion to say that works are to be carried out within available resources and no one explains ideas and plans to complete works when nothing is left with the field units as resource. Over the years the available resources have been exhausted to lowest level rather some of divisions are in minus as they have borrowed some of resources from other divisions. Since last 2-3 years the DPs, Modules, Jointing kits, EPBTs, LJUs are being allotted only in double digits to entire SSA, drop wire & UG/ OF cables are being allotted to SSAs in few hundred meters for both development as well as maintenance works. In such worst situation, real question from field officers is how to maintain the quality of services as expected by BSNL CO. This is why executives working in the field units are not able to meet such beyond expectations norms set by BSNL CO. Let us hope, in coming days there will be change in attitude of BSNL management and instead of creating pressure on field units, the arrangements will be made for at least minimum required stores. Comrades, SNEA (I) is aware of the real problems and we will put all facts & figures on papers to the Circle management and will definitely ask for real and practical solutions to meet such procedures and standards from books wherein nothing is practically available as resource in hand.     

 

23 June 14: News & Photos of Interactive session with Trainee JTOs at RTCC Pune is being uploaded.

 

23 June 14: Meeting with Shri. Prabhsh Singh, CGM ITPC Pune: {Report by Com. Virendra Choudhary JS Pune SNEA (I) MH}: Delegation of SNEA (I) led by Com. Padmanabh Rao, Joint Secretary South SNEA (I) CHQ comprising CS SNEA (I) MH, Com. V.M. Kokare DS SNEA (I) ITPC Pune, Com. S.B. Rane, DP ITPC Pune, Com. Virendra Choudhary, Joint Secretary Pune SNEA (I) MH & Com. Bharat Sonawane, DS SNEA (I) Pune had meeting with Shri. Prabhash Singh, CGM ITPC Pune in his Chamber at 1600 hrs on 18/06/2014.

In opening remark Shri. Prabhash Singh elaborated his ideas about the future strategies being adopted by ITPC unit for overall growth of BSNL. He narrated us different innovative ideas being worked out in different units of ITPC all over India. He also informed the need for making a system that will cater for all the services of BSNL immaterial of persons. He expressed unhappiness on reluctance of Heads of Circles & SSAs in reliving the officers under transfer to ITPC and requested us to take up such cases for reliving. We have made it clear that there are no such cases pending from Maharashtra Circle. He added that ITPC units at Kolkata & Chandigarh are badly in need of officers and appealed us that officer willing to work at both the units may be asked to submit their willingness.

Apart from these general discussions we had discussions on following specific points.

1.     Uniform policy for posting of Executives in ITPC: During discussions on requirement & posting of Executives to ITPC units, CGM ITPC added that he needs executives in each units of ITPC including its unit at Pune. We have made it clear that there are more than 10 requests of Maharashtra Comrades pending at BSNL Corporate office for last 2-3 years and posting is not done, as there is no requirement received from ITPC Pune. He added that his office has already sent requirement along with recommendations of his office in some individual cases and if required copy of same can be given by his office for further persuasion by SNEA (I) at BSNL CO. We pointed out that in recommending cases by his office,  there is no uniform policy and pick and choose policy is adopted as some cases with merits are neither rejected nor recommended and are just kept aside and selected cases are being recommended by his office. He informed that IT unit is need of executives with BE/B.Tech and above qualification and there may be discrimination on recommended causing unrest among others. We categorically brought to his notice how his office has biased approach and some request of executives with BE/B.Tech qualifications are also rejected and at same time some cases without BE /B.Tech qualifications are recommended. He agreed that such cases have come to his notice and at this stage he cannot take action for repatriation of such cases. Com. P.P. Rao JS South specifically explained with classic examples that only qualifications should not be basic criteria for posting at ITPC and there are certain executives, who have better knowledge of IT working even though not having BE qualification. Rejection of such genuine cases is direct & intentional injustice to such talent. We also added that there are many of the works in ITPC for which executives with minimum BE qualifications are not required and hence keeping such qualification bar is not right method & it is injustice to executives. CGM ITPC expressed that as good no. of executives with BE/B.Tech qualification are available and hence his office giving preference to such executives and his office will consider cases on merits also and already his office has recommended such cases. After elaborate discussions, he assured that he will write to GM Pers BSNL CO for uniform policy for posting of executives to ITPC units and all willingness to ITPC needs to be received by his office by online method and his office will scrutinize and recommend cases to BSNL CO for posting of executives to ITPC units. He also assured to have such uniform policy at the earliest. We also brought to his notice how ITPC Pune has become shelter for long stayed officers from Pune TD as well as from Maharashtra Circle on which CGM ITPC assured that his office will take care and the requests from executives in long stayed list of Pune TD & request from Long stay of executives of Maharashtra Circle will not be considered for posting at ITPC Pune.

2.     Canteen facility for ITPC Pune unit: We have brought to notice of CGM ITPC that due to careless approach since last 2-3 years the issue of space for canteen is not settled and about 200 employees working at ITPC are made to suffer. CGM ITPC expressed that he personally feels that canteen facility is must for ITPC and present issue of space and is being settled. We informed him that the issue is not being settled for long time as it is struck up between RTCC and ITPC. Presently RTCC wants written requisition for space, same is not being given by ITPC, and there is communication gap between two units. CGM ITPC immediately asked his PA to connect PGMT Pune, but unfortunately PGMT Pune was on leave. Then on our feedback, he called Shri. Shaha, DGM Planning Pune, who is dealing this issue and instructed him to settle the space issue by handing over the place at the second floor corner of RTCC and also to make arrangements of Canteen for ITPC employees which can be utilized both by ITPC as well as by RTCC. Hope with this immediate action the matter will be resolved. Com. V.R.Choudhary JS Pune will further coordinate in this issue and get space allotted for ITPC canteen.

3.     ERP Related Issues of ITPC comrades: We have pointed out certain ERP issues and problem faced by executives working at ITPC Pune due wrong implementation of ERP to certain extent or due to negligent approach in settlement of issues generated through ERP. A long time discussions was held on ERP issues of Maharashtra Circle. CGM ITPC agreed that in recent past many of the issues have been raised out ERP implementation in Maharashtra Circle, but same are being settled one by one. He further informed that presently issues of Form -16 & correct GPF accounting are known to him. He further added that he has already discussed these issues with ERP team at ALTTC Ghaziabad and work of Form-16 is in progress and by 21/06/2014 the problem of Form -16 will be solved for all employees latest by last week of June 2014. Regarding GPF also he informed that work is at final stage and entire GPF amount and interest has been credited and Opening balance also will be updated shortly. We had detail discussions on issues faced during implementation of ERP, the reasons for prolonged “Black Out Period” due to lack of basic preparations before declaring ERP “Go Live”, involvement of ITPC officers in implementation of ERP project in different Circles, extracting data from HRMS package, problems faced thereof, reasons for wrong salary during first month of ERP, problems in settlement of medical bills and so on. During discussions, we brought to his notice that though ERP is being implemented there is no reduction in works on papers and file movement and in some of cases work has been increased as two methods are being adopted in Official working i.e. one traditional method of physical records and one through ERP as online method as being followed in WTP and in many of the works in Maharashtra Circle. Shri. Prabhash Singh informed that Paperless working after ERP is main aim but it will take further time as many of the issues are being streamlined and issues thereof being attended. However, he was optimistic that in coming 2-3 years entire working of BSNL will be near about paperless. We have prolonged discussions on ERP implementation and its success in BSNL.

4.     Action on Revenue Generating proposals submitted by SNEA (I) ITPC Pune: We reminded CGM ITPC about the proposals submitted by SNEA (I) ITPC Pune on generation of revenue for BSNL by using talent available within ITPC units and its utilization as Business opportunity for BSNL. Shri. Prabhash Singh informed that there is no action taken on any of the issues raised, because of poor response from BSNL CO. Apart from SNEA (I) proposals he himself has given some proposals for generation of revenue for BSNL, but there is no response from BSNL CO. We requested him to give us copies of proposals given by him to BSNL Co, so that SNEA (I) will take up such issues with BSNL CO directly. Shri. Singh agreed to handover copies of such proposals.

5.     Discussions of different HR issues: Com. V.M.Kokare DS SNEA (I) ITPC has submitted the list of pending issues of ITPC comrades and mainly issued concerned to CGMT were discussed during meeting. For other issues CGM ITPC has marked this letter to GM Admn ITPC Pune for necessary action on different HR issues raised in this letter. The prominent issues discussed are :

·        Shortage of Executives at ITPC Hyderabad: Com. Padmnabh Rao, Joint Secretary South SNEA CHQ gave brief to CGMT on shortage of executives at Hyderabad and problems faced and about the present situation of ITPC Hyderabad. He requested for considering the shortage of staff at ITPC Hyderabad.

·        Permanent posting of Executives on Deputation to ITPC Hyderabad: Com. Rao brought to notice of CGMT that there are executives working on deputation to ITPC Hyderabad from different Circles and have requested for permanent posting at ITPC Hyderabad by cancelling their deputation. CGM informed that if officers concerned are willing for permanent posting his office has no hesitation of permanent posting by cancellation and assured that all such requests will be considered positively & will be taken up with BSNL CO for early settlement.

·        Delay in updating of APR’s of Executives: We have narrated the difficulties faced by executives in TBP, Regular promotions due to undue delay in up gradation of APRs. CGM ITPC assured to look into issues if any.

·        Requirement of Group C and D staff: On these issues CGMT expressed that ITPC working in at par with IT Sector where in no such arrangements are available. He quoted example of his own office wherein no special staff is posted and except one woman who takes care of different offices. As many of common works are taken care by housekeeping staff, he did not find any specific necessity of such personalized staff. He further quoted that there is acute shortage of staff and it is not possible to get staff on deputation from Pune TD. 

·        Function for award of Sanchar Seva Padak: We brought to his notice about pending felicitation program of Shri Milind Kulkarni, awardee of Sanchar Seva Padak, CGMT agreed that it has been delayed and assured to arrange it at the earliest.

·        Request transfers within ITPC: We discussed request transfer of Executives from ITPC Pune to DC Hyderabad namely Com. Dharma Teja JTO and Com. Mrs. Haritha JTO, wherein CGM assured to consider favorably.

Shri. Prabhash Singh, CGM ITPC Pune was very enthusiastic throughout discussions and was having update information on many of the issues discussed. He has assured positive steps on all issues except posting of Gr C & D Staff at ITPC Pune.

The fruitful discussions started at 1615 hrs concluded at 1730 hrs after detail discussions on each & every point. While concluding meeting Shri. Prabhash Singh assured to settle all the issued discussed and assured on priority. We also conveyed thanks to Shri. Prabhash Singh, CGM ITPC for sparing valuable time and discussions on different issues.

Issues submitted by DS SNEA ITPC Pune <<<>>>

 

21 June 14: Meeting with Member(Services) on 78.2% IDA fitment to retirees: GS Com K Sebastin, President Com G L Jogi and AGS Com V M Wankhede met Sri S C Mishra, Member(S)  and requested him to expedite the matter. Member(S) informed us that some more details are to be received from DoT (Finance) so that the reply can be sent to DoE. He further told that he is in touch with concerned officers and Member (F) and monitoring the progress on a day to day basis.

 

21 June 14: Meeting with PS to Hon MoC & IT: GS Com K Sebastin, President Com G L Jogi and AGS Com V M Wankhede met PS to Hon MoC & IT at Shastri Bhavan and discussed issues related to viability of BSNL and important HR issues: PS to Hon MoC & IT invited the Assn to get the first hand information on the issues before the formal meeting with the Hon MoC&IT, next week.

 

21 June 14: Meeting with Sr GM(CA) on EPF issue: GS Com K Sebastin, President Com G L Jogi and AGS Com V M Wankhede met Sri Rajeev Singh, Sr GM(CA), BSNL CO and discussed the issue of “Full pension” option in EPF for the BSNL recruited employees. Due to ignorance, all the employees opted “minimum pension” at the time of recruitment by default (no one given specific option for “Full pension” to EPF). Sr GM informed that BSNL is pursuing the issue with EPFO but so far no communication received from EPFO. Now it is suggested that the issue will be taken up at higher level once the new Govt settled in. The possibility of centralized payment of EPF also to be examined.

21 June 14: Meeting with GM (Pers): GS Com K Sebastin and AGS Com V M Wankhede met Sri S S Aggarwal GM (Pers) and discussed:

a)    Committee meeting on officiating pay fixation and protection of pay on implementation of TBP policy: After discussion, GM immediately spoken to the concerned officers to fix the next meeting. One of the committee members Sri K R Tiwari transferred out of BSNL CO, so another officer will be nominated before the meeting.

b)    Modification on postings – medical cases: GM assured that the critical medical cases forwarded through proper channel will be processed shortly.

c)     Modification in the SDE RR 2002 to address the shortcomings in the RR: GS requested to expedite the proposal as already the matter is pending for years together and large scale litigations are coming questioning the seniority. Now the issue is addressed by recent DoPT orders and while amending the RRs, appropriate provisions to be added in the RR. GM (Pers) informed that based on the feedback given by the Assns, the committee finalised the amendments and MC note will be prepared.

d)   Scheme and syllabus for SDE (T): Since the revision of scheme is pending, the LDCE are not able to notify by the Rect section. GM (Pers) informed that the committee constituted for the purpose submitted the recommendations with some changes but recommended to continue with two papers. Ass pointed out that the very purpose of constituting the committee was to examine the feasibility of having a single paper as the paper minimum for both papers made many posts vacant after each LDCE. GM (Pers) told that the committee is of the opinion that this will compromise on the merit as the knowledge of the candidates on various technologies as well as specialization is to be checked in LDCE. The proposal will be placed before the Management. Assn strongly pleaded for a single paper.

e)     Scheme and syllabus for SDE (TF): GM (Pers) informed that the eligibility of Chemists working in TF to appear in the LDCE to SDE (TF) is under the examination of BSNL CO and since they are Non Executives, they cannot write the LDCE directly to SDE without becoming a JTO. The LDCE for the eligible candidates are held up for last two years because of this dispute and Assn strongly demanded to finalize the syllabus and notify the same for conducting the LDCE.

21 June 14: Report on meeting of SNEA(I) Delegation with CGM ITPC Pune and Interactive session with Trainee JTOs at RTCC Pune will follow.

 

21 June 14: BSNL Broadband Plans at Glance by Com. Imran Khan, ADS SNEA(I) Bhandara & JTO(IT) Bhandara.  <<<>>>

 

21 June 14: BSNL CDA Rules 2006 updated as on 19/06/2014.  Copy <<<>>>

 

21 June 14: AGM Vig-I Mumbai endorsed clarification regarding making references and second stage advise. Letter <<<>>>

 

21 June 14: DGM TR Mumbai calls for information from IFAs of all SSAs in Maharashtra Circle  on readiness for by hand delivery of Telephone Bills of more than Rs. 2000.00 through Group C Staff of BSNL. Letter <<<>>>

 

20 June 14: Com. K. Sebastin, GS SNEA (I) CHQ writes to Hon MoC & IT regarding Strategic and key positions of board directors of BSNL lying vacant for years. Letter <<<>>>

 

 20 June 14: Meeting of Maharashtra Circle Sports& Cultural Board 2014-15 is scheduled in Conference Hall, Circle office Mumbai on 04/07/2014 at 1430 hrs  which will be headed by CGMT MH Circle. Letter <<<>>>

  Com. S.R. Kalmegh, ACS (East) will attend this meeting on behalf of SNEA (I) Maharashtra Circle. All comrades are requested to send suggestions, feedback related to Sports & Cultural activities to Com. Kalmegh by email on acsesneamh@gmail.com or on Mobile 9422857071. 

 

20 June 14: Meeting of Maharashtra Circle Staff Welfare Board 2014-15 is scheduled in Conference Hall, Circle office Mumbai on 04/07/2014 at 1100 hrs which will be headed by CGMT MH Circle. Letter <<<>>>

  Com. S.R. Bhise, ACS (West) will attend this meeting on behalf of SNEA (I) Maharashtra Circle. All comrades are requested to send suggestions, feedback related to Staff Welfare to Com. Bhise by email on srbhise@gmail.com or on Mobile 9422446699. 

 

20 June 14: Details for filing Income TAX Return under 80 CC for contribution made by BSNL employees in Prime Minister National Relief fund for flood victims  in Uttarakhand. Letter <<<>>>

 

19 June 14: AGM Staff Mumbai issued modification in Transfer policy for Executives in Maharashtra Circle. Letter <<<>>>

     With this clarification, the process of request transfers from Non tenure stations which is struck off for last one year for different wanted and unwanted reasons will speed up and comrades can now hope for their request transfers without any further delay.

 

19 June 14: Meeting with GM Fin Mumbai mainly on grant of Five Increments for JTOs recruited under PH Quota: Com. Anil Dubey DS SNEA (I) Mumbai and CS had short meeting with Mrs. Marina George, Sr GM Fin Mumbai wherein we conveyed her thanks for strict action and written orders in implementation of pending transfer order of Com. Dale, AO Buldhana.

       We mainly discussed the issue of grant of five increments to JTOs recruited under PH Quota, as it was understood that file was returned from her with remark of seeking clarification from BSNL CO. She confirmed that as it is financial matter, her office has taken decision to refer matter to BSNL CO. We brought to her notice the real facts and how the order is misinterpreted to certain extent violating principle of natural justice of equal work equal pay. We put on records that this case is pending for last two years and calling for clarification at this stage will be injustice to all these 28 comrades recruited under special drive. There late joining is due to administrative reasons and hence they cannot be denied five increments at Par with other JTOs joined after 01/01/2007. We also reminded that this matter is being pursued with her in each & every meeting by SNEA (I) and she also has assured for suitable action on this matter. We also informed that in our first meeting with Shri. M.K. Jain, CGMT MH, he also agreed about denial of natural just to these 28 JTOs & has assured us for settlement of this case and in this case file has not reached to CGMT MH and is being referred to BSNL CO is not correct. GM Fin agreed that file was not sent to CGMT as she also has certain doubts in the said order and on basis of file noting of CAO, she has taken such decision. Then we brought to her notice that there is no restriction by BSNL on payment of five increments to JTOs joined after this clarification and if her office taken lenient view and review the matter it will be justice to all the JTOs waiting for last two years.

        She further requested us to take up matter with BSNL CO as this issue may be affecting JTOs working all over India. We informed her that already matter is taken up by SNEA (I) CHQ and orders may be issued accordingly. However, at this stage we are concerned mainly for overall delay at MH Circle even though this matter is being discussed with different sections, units & officers for last one & half years and when everyone including CGMT MH has agreed that it is injustice to all these JTOs then diverting matter to BSNL CO at this later stage is not correct. This will cause further hardship to all these JTOs recruited under PH quota as they are already facing lot of problems. We also requested to grant five increments under condition that if corporate office refuses then said amount paid can be recovered and our comrades are ready to submit such written consent if required by her office. After elaborate discussions, Mrs. George agreed that she will take review of the matter by calling file back and will see how it can be settled amicably without calling for clarification from BSNL CO. Hope now, this matter will be settled shortly.

At conclusion of short & emergent meeting, we requested her for pending request transfer in Account wing; she assured that after closure of accounts of last financial year, she will look into it personally to issue all the request transfers. 

\

18 June 14: In style of new working approach towards GSM service , GM NWP CM Mumbai issued orders for transfer of CMTS BSS maintenance works of Pune SSA from PGMT Pune to GM NWO CM Pune. This order is specifically for Pune SSA, as CGMT MH has idea in mind that with this creative arrangements & new experiment of transformation of works, the targeted works like installation of new GSM BTS in Pune SSA, replacements of exiting GSM BTS with new one planned specially for Pune and redeployment of such old BTS at different SSAs will speed up & it is expected that works will be completed in minimum period which seems to be difficult under control of PGMT Pune. Letter <<<>>>

 

18 June 14: Improvement of performance of BSNL & MTNL was key area of concern of his ministry & objective was to improve services of both the organizations for better customer satisfaction. - Shri. Ravi Shankar Prasad Hon. MoC. Press Release <<<>>>

 

18 June 14: Good News: The Most Popular, MKS GSM CUG prepaid plan crosses bench mark of three lakh connections  and as on 16/06/2014 total 3,01,767 GSM subscribers are added in BSNL network from MKS III plan. Report <<<>>>

 

18 June 14: GS SNEA (I) CHQ writes to Secretary DPE seeking expeditious intervention to reiterate repeated instructions of DPE to administrative ministries to switch over to standard IDA pay scales from intermediary pay scales to DoT in the context of the proposal sent by it to DPE recently to allow it to continue with intermediary IDA pay scales of E1A and E2A in BSNL. Letter <<<>>>

 

18 June 14: AGM Staff Mumbai issued order for change of station in DGM L/A arrangements thereby retaining Shri. Shevgaonkar at Aurangabad SSA. This was one of the assurances given by CGMT MH Circle in his second meeting with SNEA (I) MH. Letter <<<>>>

 

18 June 14: AD HRD –II Mumbai calls for VCs of eight SDEs for DE Regular promotions & last date for submission is 20/06/2014. Letter <<<>>>

 

18 June 14: BSNL CO calls for VCs & APRs for CE Civil regular promotions in which three executives are from Maharashtra Circle. Letter for VCs <<<>>>         Letter for APRs <<<>>>

 

18 June 14: 3G optimization workshop is scheduled at Pune for group of five SSAs on particular day. Letter <<<>>>

 

18 June 14: BSNL CO issued compendium of BSNL Sports. Letter <<<>>>

 

18 June 14: General Body Meeting of SNEA (I) Raigad: {Report by Com. M.K. Thakur, DS SNEA (I) Raigad}: In the presence of Com. A. R. Manani, Vice President SNEA (I) CHQ & Com. M. S. Adasul, Circle Secretary SNEA (I) MH, Annual General Body meeting of SNEA (I) Raigad was held on 07/06/2014 at New Panvel O/o Sr. GMT Raigad. SNEA (I) comrades, from all parts of Raigad such as Pen, Panvel, Palaspe, Khopoli, Patalganga, Karjat, Neral. Alibag, Revdanda, Nagothane, Mangaon and Mahad have attended the meeting.

      The following comrades who have passed LDCE from TTA to JTO and posted as JTO in Raigad SSA were given warm welcomed with flowers.

·        Com. D. N. Mahajan, 

·        Com. K. S. Poddar,

·        Com. S. M. Jangam,

·        Com. Tushar B Shenvi. 

Com. M.K.Thakur, DS SNEA (I) Raigad, submitted his report to house, wherein he expressed his views about different issues and overall activities carried by him in support of his team of SNEA (I) Raigad. He appealed house to work in fearless but with full dedication for growth of BSNL. In his studied and detail speech Com. Thakur has covered following issues.  

A.  Issues related with BSNL development

1.     Tenders: There is no approved tender in r/o UG cable laying / cable maintenance / OFC maintenance etc. and so executives are facing lot of difficulties in maintaining the our door plant/and OF media. Road expansion work carried out by NHAI and MMRDA, in most of the areas has damaged our Optical Fiber Cable which is resulted in frequent failure of exchanges and BTS. In absence of any approved maintenance tender field executives are compelled to engage manpower from open market which may result in legal complications in future.

2.     Poor quality of SMPS battery of CDMA instrument: Due to external SMPS 12 Volt battery subscribers’ shows their unwillingness in taking WLL connection. Also it is observed that during rainy season there is frequent complain of non working of CDMA instruments. There is no proper mechanism for the repairing of faulty instruments and also no spare instruments are supplied for the maintenance purpose. This is resulting in delayed restoration and unnecessary invites subscriber’s complaints.

3.     Shortage of store items: There is acute shortage of store items such as UG cable, OF cable, Joint closure (SJC&BJC), TSF (IV & V), UY Connector, 5/10/20/50/100/200/400, Drop wire, EPBT, Modems etc. Our most of the cable networks are along the main road and during the rainy season to clear water logging NH/PWD/Grampanchyat authority are using JCB, which damages are UG cable. Also in some of the areas lying of water pipe line and road widening work are going on. Due to these activities our local cable as well as OFC cable is damaged frequently. Due to shortage of store items field executives are unable to restore the damaged route immediately.

4.     Up gradation of CSC: Seatting arrangement for the customers, Visuals displaying different plans, opening of cash counters during holidays, selling of recharge coupons even during late hours may help in attracting large nos. of customers.

5.     Availability of PRI tester at SSA level: One PRI tester for testing and maintenance of PRI lines may please be arranged at SSA level please.

6.     Availability of Optical Fiber Route Tracer at SSA level: Optical fiber cables in all the routes are laid twenty years back. Raigad, being the tenure station where executives are changing after every two years, in case of OF route breakdown it is difficult to identify the actual cable location along the national highway and state highway mainly. Sufficient time is lost in finding the broken cable ends. OF route tracer will be helpful in early localizing of cable ends and faster restoration.

7.     Temporary Advance: Field executives are compelled to apply for temporary advance, as we do not have any basic tender for day to day maintenance work. In absence of tender, field executives has to engage outside man power even for piece work / time work. However, piece work / time work also comes under preview of minimum wages act 1948. Labour enforcement officer is visiting Raigad frequently and in the past had issued notices to few field executives. This has created panic in everybody mind and also embarrassment to BSNL. After the finalization of tenders we may be able to keep BSNL indemnified against all loses/penalties arising out of litigation/claims initiated against the BSNL on account of acts of omission/commission which are punishable under the provisions of various Central Labour and Employment Acts. Ways should be found out to replace practice of temporary advance even for daily maintenance work.

8.     Delayed rent payment of rented building: In Raigad most of the TE building and mobile BTS are at rented site. After the ERP, enormous delay is observed in finalizing the monthly rent payment to the property owner of rented building resulting in exchanges locked by the landlords at Revdanda, Murud (Alibag Division) and Mohpada BTS (Khopoli Division).

9.     Rent revision of rented sites: As per existing norms FRAC is recommending rent hike maximum by twenty percent. Being commercial project landlords are demanding exorbitant rates. Few sites being nearer to Panvel landlords are demanding high rates. Landlords are insisting for vacating the accommodation. Shifting of exchange/mobile towers may result in huge expenditure and suitable location is also required. This has resulted in pendency of rent revision cases.

10.                                                                                                                                                                                    Replacement of life expired battery sets: In Raigad most of the battery sets have served their full life in the field. Exchanges and BTS are working on life expired battery sets. Life expired battery sets are unable to take exchange load even for half an hour and fails frequently whenever there is mains failure for prolonged duration. Now a day’s MSED supply is erratic in whole Raigad.

11.                                                                                                                                                                                    Co-ordination with WTR Panvel/Pen/Mangaon: Optical Fiber Cable along the NH 17, Patalganga Panvel, Khopoli Karjat, Panvel Khopoli, Pen Khopoli, Pen Alibag belongs to WTR. From SSA side we are extending best co-operation to WTR. Due to ongoing road expansion along the all main roads there is frequent WTR OF route breakdown resulting in failure of telecom services in Raigad. Khopoli Karjat OF route due to MMRDA activities is badly damaged and is beyond repair. Rehabilitation of Khopli Karjat is of prime importance otherwise in case of Chawk Karjat route breakdown complete Karjat SDCA including Neral and Matheran is totally isolated. WTR Raigad also needs to extend their best support to SSA.

 

B. HR issues

 

1.     Request transfer cases within Raigad SSA: Case of Smt. Nilima Singh (Alibag to Panvel) : Management has assured to implement request transfer cases after the completion of tenure period.

2.     Relieving of transferred executives: Relievers are being posted but joining late and it becomes very difficult in relieving the transferred executives from Raigad. Relievers posted against the transferred executives of tenure station must join early.

3.     Posting of executives at Tenure station: Raigad being the tenure station, where most of the stations are rural or unpopular as far as possible posting of female executives in Raigad should be avoided.

4.     Posting of transmission trained staff in Raigad: Very few staffs working in Raigad are transmission trained which is resulting in poor transmission performances. It is requested to post few transmission trained executives considering the NOFN project and overall improvement of OF media performances.

5.     Request Transfer of Shri D O Petel DE Khopoli to MP Circle: Request application of Com. D O Patel to MP Circle is forwarded to AGM(Pers I), BSNL Corporate Office vides letter number A/STA/AE-21/STS/ICT/2012-13/94 dated at Mumbai 30/12/2013.

Ø Therafter , during interactive session, house has bestowed the special thanks to Com. S K Shaikh, JTO Khopoli and Com. D. O. Patel, DE Khopoli in stopping the illegal digging activities carried out by M/S Vodafone on Khopoli Pali route.

Ø Com. Mrs. R.V.Potdar, District Treasurer SNEA(I) Raigad submitted the accounts of SNEA(I) raigad to the house, which was appreciated by the house with loud clapps. 

Ø Com. L. G. Valvi, President of SC/ST Welfare Association Raigad, has also attended the meeting and gave valuable tips for monitoring and improving the BTS uptime.

Ø Com. C. V. Rao, DGM (P&A) Panvel and member of SNEA (I ) had addressed the gathering and assured full management support to strengthen BSNL. In his speech he explained the various ways of improving customer growth and providing reliable services to our esteemed customers. He also assured that management will extend their best support in improving the BSNL performances.

Ø Com. A.R. Manani, VP SNEA(I) CHQ addressed gathering his special style and expressed details of different issues being pursued by SNEA(I) CHQ, analyzed working of SNEA(I) Maharashtra and overall persuasion of different HR issues by SNEA(I) MH. He also shared his experience in day to day working and guided house to overcome day to day difficulties with positive attitude and appealed comrades of SNEA (I) Raigad, to make serious efforts in strengthening BSNL Raigad. He also made house aware on different HR issues being pursued by SNEA(I) CHQ and narrated house on deliberations held at CWC Jaipur.

Ø Com.M.S. Adasul, CS SNEA(I) MH expressed gratitude to SNEA(I) Raigad, for dedicated & strong support to SNEA(I) MH and analyzed different issues raised by Com. M.K.Thakur. He appealed to report pending issues as and when noticed and mentioned that pendency can only be cleared by continuous persuasion. He made house aware about different HR issues related to tenure station being pursued by SNEA (I) MH, status of transfer policy for tenure as well as non tenure stations, period for issuing Tenure transfers etc.

Ø Com. S.W.Kohadkar, DP SNEA(I) Raigad, in his Presidential speech, expressed gratitude towards SNEA(I) Raigad comrades and conveyed thanks for strong support extended to SNEA(I) leadership. He further assured the house that SNEA (I) Raigad will continue its struggle for settlement of pending issues.

Ø After the detailed discussion President has dissolved the existing District Body and Com. C.V. Rao was nominated as election officer for holding Elections for new District Body. After following detailed procedure, following District Body has been unanimously elected for year 2014-16.

1. District President: Shri S W Kohadkar

2. District Secretary: Shri M K Thakur

3. District Treasurer: Smt R V Poddar

4. Assistant District Secretary: Shri D M Mahajan

5. Area Secretary Alibag Shri A R Khaire:

6. Area Secretary Mahad : Shri S R Padwal

7. Area Secretary HQ: Shri M I Bagewadi

8. Executive Member: Shri S K Shaikh

9. Executive Member: Shri Tushar B Shenvi

At last Com. A.R.Manani, VP SNEA (I) CHQ gave oath alliance to newly Elected District office Bearers and also felicitated them with bouquets.

The meeting which started at 1730 hrs was concluded at 2115 hrs with National Anthem. 

 

17 June 14: First Executive Membership Verification in BSNL: BSNL Corporate Office issued notification for reorganisation of majority Executive Association in BSNL. 

               Notice <<<>>>   Letter for Facilities   <<<>> 

Schedule of First Executive Membership Verification in BSNL

Ø Last date for submission of application by Associations    : 15/07/2014

Ø List of Associations eligible for Membership Verification : 31/07/2014

Ø Last date for Withdrawal of application                                : 05/08/2014

Ø Final list of association participating in verification            : 12/08/2014.

Ø Elections                                                                                     : 10/12/2014.

Ø Declaration of results                                                               : 12/12/2014.

 

17 June 14: AGM Estt Mumbai endorses different letters on merger of Civil/Electrical wing with SSA and asks for compliance for same within week’s period. Letter <<<>>> 

 

17 June 14: In a letter without any subject, AGM Estt Mumbai published seniority of list of 135 DEs including both Adhoc and Regular DEs, calling for additions/omissions/modifications if any by email on agm.estt@gmail.com. It is understood that this information is called to update information in seniority list and overcome mistakes in promoting juniors by keeping seniors on waiting list as happened in some recent cases of DGM L/A orders. Letter <<<>>> 

         All concerned comrades as well as DS concerned are requested to see that update information is sent Circle office immediately as no. of DGM posts are vacant in different SSAs and such delay causes overall delay in already lengthy & time consuming process adopted in Circle Office for DGM L/A promotions.

 

17 June 14: Without assigning any reason, AGM Staff Mumbai kept DGM L/A orders dated 11/06/2014 in abeyance. Perhaps, reason may be idea to issue all DGM L/A orders together or to settle issue of seniority within Pune SSA.  Letter <<<>>>  

 

17 June 14: It Happens in Maharashtra Circle !!!!!  In third attempt after Raigad & Sangli SSA Head posting/reporting, to satisfy requirement of individual officers for not taking responsibility of SSA Head, AGM Staff Mumbai issued orders for change in reporting of TDM Beed from GMT Ahmednagar to GMT Nashik. Letter <<<>>> 

             It is understood that GMT Ahmednagar has expressed his inabilities in taking responsibility of Beed SSA for personal reasons and for his wish, now by crossing all the borders of so called “Zones” proposed by Circle management and neglecting nearby SSA Heads like GMT Aurangabad (137 Kms), GMT Solapur (186 Kms), GMT Ahmednagar (134 Kms) and many GMs in Pune SSA ( 255 Kms) which are convenient to Beed by road and also by keeping aside guidelines issued by BSNL CO on this subject, now TDM Beed will report to GMT Nashik (273 Kms). It is well known that Nashik is not convenient to Beed SSA geographically as well as in connectivity by road and train & it takes about overnight journey from Beed to Nashik.  This special order will definitely give relief to GMT Ahemednagar in person, but will surely increase administrative expenditure of BSNL, will increase inconvenience for overall functioning of Beed SSA  and will cause overall delay in day to day office works.

           This is third such attempt for increasing difficulties of small SSAs by Circle management to cope up with wish of individual officer not willing to take over responsibility of SSA Head. In First attempt of favoritism, Circle Management has disturbed well defined working of Raigad SSA by separating TAX Exchanges from Raigad SSA and downgrading post of GMT Raigad to TDM Raigad.  It is funny that same officer refused to accept posting as GMT Raigad is ready to look after charge as TDM Raigad and continues works from same location. In Second such attempt, charge of Sangli SSA is removed from GMT Kolhapur and handed over to PGMT Pune, who was GMT Sangli for many years in recent past. It is fact that Pune SSA is having its own heavy load and PGMT Pune is unable to overcome crises in Pune, how can he control Sangli SSA which is 231 Kms away from Pune and why not GMT Kolhapur who is just 50 Kms away from Sangli. One can imagine increase in expenditure on vehicle and TA/DA of officers on such unwanted changes. It is dam sure that with such changes also there will not be much improvement in overall working and increase in revenue which is main aim of BSNL management, on the contrary such arbitrary changes will increase overall expenditure and will benefit individual officers to settle personal interests.  

           It is clear that all such attempts are specially made to satisfy individual requirement of concerned officer and as per wish and will of individuals and there is nothing like administrative in such orders. All such orders are issued with priority of individual’s interest and neglecting administrative requirements & this is reason for concern by SNEA (I) MH. If it was priority to BSNL, then best option was to shift such unwilling officer and rearrange posting of SSA heads if required in Zonal manner as per new creative idea by Circle management as there is scarcity of SSA Heads, but not such eye wash orders with backdoor ideas.

         We strongly believe that due to this strange and personal approach of Circle Management, reporting of SSA Heads is being issued to safeguard personal interest or to set enmities among different officers and decisions are being taken without applying basics and requirement of that SSA which means that BSNL requirement has lowest priority as compared to individual requirement. This is possible only in Maharashtra Circle and we will be lucky enough to see such more ‘funny’ orders in days to come. SNEA (I) MH will take up this matter with CGMT MH Circle, after his return from official tours for last six days, just to understand reasons for such ridiculous orders of reporting of SSA Heads and to have proper arrangements for smooth working of all these SSAs.   

 

16 June 14: general body meeting of snea Amravati : {Report by Com. S. A. Sarode, JS Vidarbha, SNEA MH}  As per notice issued by Com. P. H. Kandalkar , DS SNEA(I) Amravati, a  special GB Meet of SNEA Amravati  was organized on 13/06/2014  at 1730 Hrs at Conference Hall of Telephone Bhavan, Amravati. This General Body meeting was presided by Com. A. V. Changole, DP SNEA Amravati. The meeting was also attended and addressed by

1.     Com. S.V. Bhad, CP, SNEA MH,

2.     Com. M.S. Adasul, CS SNEA MH,

3.     Com. S.R. Kalmegh, ACS(E), SNEA MH ,

4.     Com. N.S. Gadre, CWC Member SNEA MH.

5.     Com. S.A. Sarode, JS Vidarbha, SNEA MH.

Ø This meeting was specially attended by Com. R.S.Narsingh, ADS SNEA Yawatmal, Com. K. K. Gaidhani , DT SNEA Yawatmal, Com. M. P. Fursule, Executive Member SNEA(I) Yawatmal

Ø Com. P.H. Kandalkar, DS Amravati and his complete team along with all comrades of SNEA Amravati who arrived from every corner of the district gave warm welcome to all the dignitaries who came for the meeting after travelling a long distance in hot Summer of Vidarbha. All the dignitaries were heartily welcomed by offering a beautiful bouquet of flowers.

Ø Com. Mrs. A.K. Chungade, ADS SNEA Amravati in her welcome speech expressed gratitude and thanked the Circle leaders for coming and gracing the meeting.

Ø Com. P. H. Kandalkar, DS SNEA (I) Amravati, while presenting his DS Report, informed the house how tough was the situation of SNEA Amravati when he took the charge of DS as every comrade of Amravati. Copy of DS Report <<<>>>

Ø Thereafter SNEA (I) Amravati specially felicitated and gave warm welcome to the following newly joined members with bequests by Circle Leaders.

1.                 Com. N. A. Landore, JTO Daryapur,

2.                 Com. Mrs. V. M. Bele, JTO OCB Amravati,

3.                 Com. R. B. Sontakke, SDE PR Amravati,

4.                 Com. P. S. Pophale, AO Amravati,

5.                 Com. Kishor Pache, JTO Achalpur,

6.                 Com. Nilesh Wankhede, JTO Paratwada,

7.                 Com. S. S. Yelne, JTO Morshi.

Ø SNEA (I) Amravati also honored its Veteran Member Com. L.M. Vikhar, SDE on his superannuation retirement and he was felicitated by the hands of CS SNEA (I) MH by offering a gift and bouquet of flowers.

Ø Com. G.M. Talmale, Ex President SNEA Amravati was also felicitated with bouquet.

Ø Com. V.R. Jadhav, DT SNEA Amravati, then presented the District Treasurer SNEA (I) Amravati and happily announced the cash balance has raised up to Rs. 1 Lakh in the district SNEA account. He also added how he and his team took special efforts to raise the funds of Amravati Division. The report was passed unopposed and with thundering claps by the house acknowledging his efforts.

Ø Com. S. R. Kalmegh, ACS (E) SNEA (I) MH, while delivering his motivating speech appreciated the efforts taken by the local SNEA team. He appreciated Com. Kandalkar for handling and coordinating the SSA at high time and for taking initiatives at various levels. He also appreciated Com. V.R. Jadhav and Com. S.H.  Gandhi for playing very vital role in SSA activities. He commented for maintaining the uniformity by the local administration while executing local urban to rural transfers and urged house for drafting and finalizing local transfer policy as per requirements of the SSA. He also shown the deep concern about the scarcity of various resources like UG Cables, Battery, OFC, power plants, drop wire, and jumper wire while maintaining the services. He requested and asked to raise voice to fulfill all these requirements on time. Com. Kalmegh raised the issue of Reliance Jio which is a threat to BSNL’s various services and expressed his disappointment that BSNL management has not planned any counter action to the move of Reliance Jio.

Ø Com. N.S. Gadre, CWC Member SNEA MH, while addressing the house in his typical shero-shayary style, expressed his sentiments and informed how difficult it was to conduct very successful CEC at Yawatmal when majority of the Yawatmal office bearers including DS Yawatmal were transferred out of SSA or Circle. He thanked Com. Adasul for showing faith for holding CEC by Yawatmal team during this very tough time. He added that how the fund was raised in a very short time and a big amount was donated to SNEA MH Circle by Yawatmal team. He reiterated and expressed thanks for retaining all the LDCE passed SDEs of Yawatmal at their home SSA who were earlier transferred out of Circle. He appreciated the efforts by CHQ leadership and continuous persuasion by the Circle leadership.

Ø Com. S.A. Sarode, Joint Secretary Vidarbha, SNEA MH, while addressing the house, appreciated the work culture and unity of all nine districts of SNEA Vidarbha and explained his role for maintaining cordial relationship and bonding among the various Vidarbha districts. He informed the house about the importance of arranging various tour programs of CHQ / Circle leaders at various districts of Vidarbha making them aware about difficulties that are faced by local comrades. He explained house various initiatives that are taken at Vidarbha Level and reminded for persuasion of declaration of Gadchiroli as All India Soft tenure, in tune with words given by CHQ leaders, Reformation and revival of SNEA Bhandara division, increase in membership at various districts of Vidarbha, BNG migration issue at Nagpur from Kolkata. He also appreciated the lion-hearted efforts by both Com. S.R. Kalmegh and Com. N.S. Gadre for handling tough time at Amravati and for conducting CEC at Yavatmal in very tough time respectively. He thanked CS for taking efforts to retain LDCE passed SDEs at MH Circle and appreciated the patience shown by affected comrades who were earlier posted out of Circle. He also expressed confidence that by taking note of very successful CEC at Yawatmal, remaining eight districts will certainly be encouraged to come forward and conduct next CEC in Vidarbha itself.

Ø Com. S.V. Bhad, CP SNEA MH, in his address appreciated the work by Com. M.S. Adasul as a CS MH Circle and passing resolution for forming various work committees for the revival of various telecom services of MH Circle. He also thanked Hon. CGMT MH Circle for acknowledging the efforts taken by SNEA MH Circle in this regard. He raised the issue of mobile services of BSNL MH Circle and demanded for early replacement of faulty GSM hardware. He pointed out the difference in between the systematic and development oriented work policies of SNEA and the self-oriented wrong policies of other executive associations. Com. Bhad also appreciated the work carried out by the Team SNEA Yawatmal for successful execution of CEC and extended his best wishes for the new team of Amravati being getting elected.

Ø Com. M.S. Adasul, CS SNEA MH, in his marathon speech of one & half hour, explained the house about various activities and initiatives that are taken at Circle/CHQ Level. He updated the house about the activities and discussions that took place at CWC Meet at Jaipur and confidently assured the house that the demand for uniformity will be brought while providing first time bound promotion after 4 years only. He requested all the affected comrades to keep faith in the working of CHQ and asked to wait for the fruitful outcome in days to come. Com Adasul informed the house about the role of association in framing various policies at Circle level and finalizing transfer policy within framework of BSNL transfer policy and in tune with resolutions passed in CEC Yawatmal. He explained the role of association in recovery of illegally granted free calls on FSRTC bills from the selected officers and reiterated that the association is duty bound to the ethics and such malpractices will never be tolerated. He also informed the house the actual reasons for delay in executing request transfers from non tenure station and assured that shortly all such requests will be executed as action has been initiated by Circle management. He updated the house about the various cases including court cases on ITS repatriation, JTO to SDE DPC under 67% seniority cum fitness quota, status of court case pending in Ernakulam Court, implementation of 78.2% IDA merger for retired employees, Various resolutions that are passed at CWC Jaipur and expressed that SNEA (I) is serious about the issues of DR executives mainly CPSE cadre hierarchy, 30% superannuation benefits and standard pay scales are TOP Priority issues. He appreciated the team work of SNEA Amravati, firmness shown by them in tough situations.

Ø Com. L.M. Vikhar, SDE Retired generously announced donation of Rs. 5001.00 to SNEA (I) and handed over cheque of said amount to CS SNEA MH for various Circle level activities.

Ø Com S.R. Kalmegh, ACS East in a very special note thanked Com. L.M. Vikhar for his liberal donation, love & affection towards SNEA (I) and the house also appreciated Com. Vikhar with thundering claps.

Ø Then discussions were held on Local Transfer Policy for Amravati SSA for rural to urban request transfers, which was finalized unanimously.

Ø There after Com. A.V.Changole DP, conveyed thanks to all the comrades of Amravati and dissolved existing District body for new elections.

Ø Com. G.M. Talmale, Ex President SNEA Amravati was nominated as election officer for conducting elections. Com. S.A. Sarode, JS SNEA (I) MH functioned as Circle observer.

Ø The new body of SNEA Amravati was elected unanimously and Com. D.H. Bhad,   Com. S.H. Gandhi and Com. P.H. Kandalkar were unanimously elected as DP, DS and DT of SNEA Amravati respectively. List of newly elected District Body <<<>>>

Ø The meeting which started at 1730 hrs concluded at 2230 Hrs with National Anthem and delicious dinner thereafter.

Ø The entire meeting was nicely anchored by Mrs. A.K. Chungade ADS SNEA (I) Amravati.

 

Ø PHOTOs by Com. Jagdish Kumar, JTO & Com. S.S.Yelne, JTO <<<>>>

 

 

14 June 14: Editorial June 2014 <<<>>>  

 

14 June 14: SNEA(I) Satara gives warm welcome to recently promoted JTOs: In special Executive Body meeting SNEA(I) Satara gave warm and wholehearted welcome to all five comrades namely Com. Tejas Tadsare, Com. Niranjan Mehendale, Com. Pratap Deshmukh, Com. Kiran Tarte & Com. Mrs. Surekha Joshi by offering bouquet. Com. Tejas Tadsare, is Co-ordinater of SNATTA CHQ and has played vital role in building unity of all LICE passed TTAs throughout Maharashtra Circle and has always taken leading in resolving many of the issues of these comrades earlier in TTA cadre and now in JTO cadre. All five comrades have joined SNEA (I) Family by submitting the membership form to Com. S.V.Patil, DS SNEA (I) Satara & Com. B.G.Katkar President SNEA (I) Satara in presence of all Executive Body members and activists of SNEA (I) Satara. Photo <<<>>>  

 

14 June 14: SNEA (I) MH congratulates Master Yogesh Unde, on his grand success in UPSC Examination 2013 wherein he has secured 737 rank. Master Yogesh has completed his graduation from Electronics and Telecommunications& is son of Com. P.S. Unde JTO Takali Dhakeshwar in Ahmednagar SSA, (Mob 9422087345).  

 

14 June 14: BSNL signed MoU with Oriental Bank of Commerce for different loans for BSNL employees and it will be valid from 06/04/2014 to 05/04/2015. Bank offers special discount of 0.25 % in rate of Interest on personal loans for women employees. Letter <<<>>> 

 

14 June 14: AGM Estt Mumbai issued reminder to certain SSA Heads for sending IPRs for Period Ending Dec-2013. Letter <<<>>> 

 

14 June 14: BSNL CO issued confirmation orders of BSNL recruited DGMs w.e.f. 25/10/2014. Letter <<<>>> 

 

14 June 14: As per clarification issued by BSNL CO on BSNL MRS , the medical claims for indoor treatments for which CGHS rates are not available,  can now be claimed & settled as per rates approved by AIMS. Letter <<<>>> 

 

14 June 14: GM NWO CM Pune issued Action Plan for improvement of 2G & 3G Data traffic in Maharashtra Circle. Letter <<<>>>  Annex <<<>>>

 

14 June 14: DGM NWO CM Mumbai writes SSA heads for improvement of QoS of GSM services in Maharashtra Circle. Letter <<<>>> 

 

 13 June 14: General Body Meeting of SNEA (I) Amravati is scheduled on Friday, 13/06/2014, at 1630 Hrs at Conference Hall % GMT Amravati.  Com. P. H. Kandalkar, DS SNEA (I) Amravati appeals all comrades from Amravati SSA to attend this GB Meeting in time and make it grand success. Com. S.V. Bhad, CP SNEA (I) MH, Com. M. S. Adasul CS & Com. S.R. Kalmegh ACS (E) SNEA(I) MH, Com. N.S. Gadre,  CWCM Com. S.A. Sarode JS Vidarbha SNEA(I) MH have given consent to attend & address this GB Meeting. Notice <<<>>>

 

13 June 14: AGM (Estt) Mumbai calls for revised justification of TTAs and this time with signature of SSA Head so that correct and accurate justification is given for each SSA. Letter <<<>>> 

 

13 June 14: In special approach to downgrade Raigad SSA from GM to TDM, AGM Staff Mumbai issued advance orders& now Shri. A.B.Gupta, GM Trans Mumbai will look after charge of Raigad SSA in downgraded TDM position in place of his earlier posting as GMT Raigad. Letter <<<>>> 

 

12 June 14: AGM Staff Mumbai issued retention order of Five LICE passed SDEs posting them as it is where it is. Letter <<<>>> 

 

12 June 14: CGM MH Circle writes SSA Heads for settlement of claims of vendors printing Telephone Bills and timely printing of bills along with some other issues and calls for compliance latest by 20/06/2014. Letter <<<>>> 

 

12 June 14: AGM Estt Mumbai calls for VCRs& information of eligible officers due for E-3 to E-4 & E-4 to E-5 TBP quoting that advance DPC for these TBPs will be held shortly. Letter <<<>>> 

 

12 June 14: AGM Admn Mumbai issued revised list of empanelled hospitals in Mumbai. Letter <<<>>> 

 

12 June 14: CHQ President attended National Executive Committee meeting of NCOA on 8th June at New Delhi. National Executive of NCOA too stock of various HR issues of CPSU. Particularly, the issue of constitution of 3rd PRC by government was discussed at length and the strategy to be adopted to force the government to constitute 3rd PRC with appropriate terms of reference was also discussed. Constituents of NCOA need to be reactivated so that they face future challenges of CPSUs, particularly issues relating to 3rd PRC successfully and effectively, NEC was of the unanimous opinion. SNEA (I) gave Rs 1 lakh towards membership subscription of its Association to SG/NCOA.

           Representatives of officers Associations from banking sector, coal sector, power sector and all the constituents of NCOA had a brainstorming discussions on future strategy to be adopted by CPSUs to further strengthen CPSUs and thus facilitate them to participate aggressively and proactively towards fulfilling the agenda of the new government to accelerate economic growth in the Country. A resolution to this effect was unanimously adopted. Also a steering committee comprising of representatives from power sector, banking sector, telecom sector, and SG of NCOA was constituted to prepare future strategy and plan of action to meet the resolution adopted. Telecom sector is represented by CHQ President and GS MEA, Com V.K.Tomar. Very shortly the steering committee will meet to draft and finalize future strategy and course of action. GS/SNEA (I) could not attend since he is presently in Kerala for some personal work.

Resolutions of NCOA <<<>>>

 

12 June 14: CHQ president met senior officers of Telecom finance in DOT on 3rd June to enquire about the latest status of 78.2% IDA merger for retired employees of BSNL. Concerned officers in DOT informed President that note on the issue is being drafted in consultation with the concerned officers of DOE (department of expenditure) and thereafter the note will be sent to DOE for its approval.

 

11 June 14: AGM Staff Mumbai published list of 25 Circle level long stayed SDEs. This is third time such list of long stayed SDEs is being published and perhaps this may be final list as corrections/modifications are called latest by today evening. Letter <<<>>> 

 

11 June 14: AGM Staff Mumbai issued DGM L/A for three DEs on where is, as it is basis. Letter <<<>>>  

 

11 June 14: Com. K. Sebastin, GS SNEA (I) CHQ writes Shri. R.K.Upadhay, CMD BSNL for immediate action as per resolutions passed in CWC Jaipur. Letter <<<>>>   <<<>>  

 

 10 June 14: In a letter addressed to SSA Heads Sr GM HR/Admn Mumbai writes on rotational transfer of Officers/Officials working on sensitive post and compliance report by 16/06/2014. It has been warned that CGMT MH has taken this matter seriously and non compliance of this order may call for harsh action from BSNL Corporate Office. Letter <<<>>> 

 

 9 June 14: As per letter from AGM Estt Mumbai special batches of Mandatory TBP training are arranged for executives who have crossed age of 55 years and batches starts from 23/06/2014 and last date for submission of nomination is 16/06/2014.  Letter <<<>>>  

 

9 June 14: AGM Staff Mumbai calls for stay particulars of JTOs who are recently promoted from TTA Cadre under Departmental quota. This data is being called for updating long stay list in JTOs cadre which will be operated for posting substitute for Request Transfers within Maharashtra Circle. Letter <<<>>> 

 

 9 June 14: As per letter from Ad GM NWP CFA Mumbai technical audit of NMICT Project of Pune, Nagpur & Kolhapur SSA will be carried out from 16/06/2014 to 28/06/2014. Letter <<<>>> 

 

 9 June 14: In fifth reminder letter, CAO ERP II Mumbai writes IFAs of all SSAs for closure of Temporary Advances during 01/10/2013 to 31/03/2014 and make balance amount ‘Zero’. Letter <<<>>>      Annexure <<<>>>

 

9 June 14: AGM Admn Mumbai issued two months extension i.e. up to 31/08/2014 for five BSNL empanelled hospitals in Mumbai area. Letter <<<>>> 

 

7 June 14: General Body Meeting of SNEA (I) Raigad is scheduled today on 07/06/2014, at 1600 Hrs on Second Floor, Office of GMT Raigad, New Panvel. Com. M.K. Thakur, DS SNEA (I) Raigad appeals all comrades from Raigad SSA to attend this GB Meeting. Com. A. R. Manani, VP SNEA (I) CHQ, Com. M. S. Adasul CS & Com. M. M. Wadhwani, JS Kalyan have given their consent to attend & address this GB Meeting. Notice <<<>>>

 

7 June 14: SNEA (I) Maharashtra congratulate Com. S.D. Gedam, DE Nalasopra Kalyan SSA & his team consisting of Com. R. Agarwal, SDE, Com. V.G. Lokhande, JTO, Com. V.P.Singh, JTO & Com. S N Tripathi JTO for their sincere & dedicated persuasion with MMRDA for recovery of Cable damage charges during Road Widening Activities carried out by MMRDA on NH-8 from Nalasopara to Nirmal. Till now, Team has recovered Rs.12,84,207.00 (Rupees Twelve lakh Eighty Four Thousands, Two Hundred Seven Only) from MMRDA. This team under valuable guidance of Com. Sharad Daspute DGM Vasai, issued Demand Note of Rs. 25,68,413.00 to MMRDA and partial amount is received by BSNL by cheque. This is major achievement and this amount will be most useful for restoration of affected telecom services in Nalasopara area.

 

 7 June 14: Update on GPF Balance, Form -16 for year 2013-14 & pending Medical Bills: SNEA(I) MH has received complaints about “zero” balance through ERP or change in last balance of the GPF Accounts from our many of active  comrades. We also have received complaints about non availability of Form 16 which is must for Income Tax returns as we have already reached in month of June 2014. This has caused much unrest among executives and staff as there is no update from management side. By taking note of this, SNEA (I) MH had meeting with Shri. V. N. Dhage, DGM ERP Mumbai.

Shri. Dhage agreed that there are certain issues about GPF balance/interest as well as Form 16. Present GPF balance shown in ERP is not correct & till the issues related Form 16 through ERP are not resolved. This happened as Maharashtra Circle is completing both the activities through ERP for first time and to understand the real problems and to get rid of all problems, more time has been taken by his team. But he informed that his ERP team along with team of HCL is on the job and work of updating GPF data along with crediting yearly interest on GPF balance is at progressive stage and same will be updated very shortly. In respect of Form 16, he informed that till there are certain issues with this work, but he is in touch with Core team of ERP and assured that hopefully by next week Form -16 will be ready for all Staff & Executives working in entire Maharashtra Circle.

         We have further discussed with him the status of pending medical bills and action taken by management for clearance of these bills. He informed that there are certain issues raised by Add GM HR/A Mumbai and issue is struck up at decision of final authority either from Admn or from Finance and names of officers for processing & payments of bills and its custody thereafter.   Shri. Dhage, informed that discussions are going between Higher levels of  Finance and Admn Section Mumbai and if nothing goes wrong shortly matter will be settled and final decision will be taken on processing Medical Bills either through ERP or by Off line method as followed in year 2013-14. Also decision on final authorities for processing and payments of Medical bills from Admn or /and Account Section will be finalised.  Meanwhile the Medical bills of year 2013-14 are being processed by Account Section, but as total number of Medical bills are more, it may take some more time to clear all pending medical bills.

 

 7 June 14: In continuation to CAO to DGM Adhoc promotion order issued by BSNL CO,  CAO FC Mumbai issued further posting order within  Maharashtra Circle.  Letter <<<>>>

 

7 June 14: CAO FC Mumbai writes SSA Heads/IFA for submission of missing APRs of 16 officers in Account Cadre. Letter <<<>>>

 

 6 June 14: Thanks to Sr GM HR/Admn Mumbai: SNEA (I) Maharashtra conveys sincere thanks to Shri. Pravin Malhotra, Sr GM HR/Admn Mumbai for his kind intervention and taking up matter with MTNL authorities for restoration of FSRTCs of BSNL Staff& Officers having FSRTC in MTNL Mumbai area which were disconnected for non payment of bills prior to 2007. Many of executives were facing this problem of disconnection as they were unable to pay the amount as outstanding amount was prior to 2007, which is not to be paid as per prevailing orders from both the side and at the same time MTNL authorities were not giving any heed to repeated individual requests and were strongly insisting for making payments. Some of individual cases were pursued through Com. S.N.Prasad, President MTNLEA and were settled, but as number of cases were more, it was not possible to pursue all cases individually. Hence SNEA (I) has taken up this issue with Shri. Pravin Malhotra, Sr GM HR/A Mumbai and submitted him list of FSRTC disconnected for old outstanding payments. We also had requested him for taking up matter with MTNL authorities for restoration of 30% discount on all Telephone Numbers of BSNL in MTNL area including FSRTCs. The 30 % discount which was earlier granted by MTNL has been stopped at later stage due to delay in its implementation on part of BSNL, is not yet restored and bills are charged without discount. Now, with kind intervention of Shri. Malhotra one of the issues i.e. disconnection of FSRTCs has been solved and all FSRTC disconnected for outstanding bills prior to 2007 are reconnected within 24 hours. Shri. Malhotra has assured to take up matter of 30% discount with concerned authorities of MTNL and very shortly same will be granted in all bills of BSNL for telephones working in MTNL Mumbai area including FSRTC, thereby giving benefits of 30% discount to BSNL as well as to all executives residing in area of MTNL Mumbai. Even though matter of disconnection has been settled, till someone is facing this problem of disconnection for outstanding amount prior to 2007, he/she may please contact Com. Anil Dubey, DS SNEA (I) Mumbai on 022-26467385 /9423991974, so that same can be restored at the earliest.

 

 6 June 14: As per clarification issued by DoPT, the condition of minimum period of 15 days CCL (Child Care Leave) has been removed and now eligible officials/officers can apply even for short period of CCL.  Letter <<<>>>

 

 5 June 14: AGM L&B Mumbai published waiting list for Staff Quarters in Mumbai to be operated during year 2014-15. Objections on this waiting list, if any, are to be submitted within 15 days period.   <<<>>>

 

 5 June 14: CAO FC Mumbai issued AO Looking arrangements for 78 JAOs by posting them as it is where it is basis.  Order <<<>>>  <<<>>>

 

 5 June 14: ALTTC Ghaziabad arranged Three Days Workshop on RF Planning, Engineering & Optimisation of 2G/3G Network from 18/06/2014.   <<<>>>

 

 5 June 14: BSNL invites applications for DSAs (Direct Selling Agents). Press Release <<<>>>

 

 4 June 14: Emergent meeting with CGMT MH Circle: Delegation of SNEA(I) MH, consisting CS, Com. Anil Dubey, DS SNEA(I) Mumbai, Com. Prashant Jadhav, VP SNEA(I) Mumbai attended emergent meeting with Shri. M.K.Jain, CGMT MH in Sixth floor, Conference Hall, BSNL Admn Building, Santacruz (W) Mumbai on Saturday, 31/05/2014 wherein we have discussed recent arbitrary changes in Executive Transfer Policy and undue delay in issuing request transfers from Tenure as well as Non Tenure Stations.

Apart from CGMT MH, from management side meeting was attended by Shri. Pravin Malhotra Sr GM HR/Admn, Shri. Mukesh Mangal, Add GM HR/Admn Mumbai and Shri. P.R.Sule, AGM Staff Mumbai. 

This emergent meeting was arranged specially for discussions on arbitrary changes made by Circle management in Transfer Policy of executives. We registered our strong protest on back door changes in Transfer Policy and asked reasons for unstable stand taken by management mainly on three important points incorporated in Transfer Policy namely:

1.     Changing frequency of Tenure Transfers from Monthly to Quarterly basis.

2.     Reasons for unstable stand of Circle management on “Posting substitute for non tenure stations”.

3.     Remark in letter of transfer policy about consultation with SNEA (I) when practically there was no discussion with or by SNEA (I) with Circle management on any of these changes incorporated.

4.     The management on its own has discussed the point of counting combined stay of executives working in MMRDA area.

        The meeting started 1215 hrs wherein we had detail discussions only on above four points and this emergent meeting concluded at 0150 hrs with assurance of CGMT MH that his office will take care of all the issues in tune with transfer policy guidelines issued by BSNL and will review the points discussed by us by considering feedback received by his office on this subject. He further assured that the transfer policy for request transfer of executives working at Non Tenure station will be finalised without any further delay & transfer orders will also be issued within one week’s period. We also conveyed thanks with hopes that management will take clear stand on this transfer policy and keep its words for issuing all pending transfers from Tenure as well as non tenure stations.    

Minutes of this emergent Meeting <<<>>>

 

 4 June 14: As per letter from AD Admn II Mumbai the payment of Book Award and Scholarships for year 2012-13 for staff & officers in Circle office Mumbai will be made between 1430 hrs to 1630 hrs on 05/06/2014 & 06/06/2014 at second floor Conference Hall, BSNL: Admn Bldg,  Satnacruz (W) Mumbai. Letter <<<>>>  

 

 4 June 14: As per letter issued by AGM (L&B) Mumbai the penalty for unauthorised occupancy of Staff quarters will be 50 times of licence fee for staff quarters in Mumbai and 40 times of licence fee for staff quarters in rest Maharashtra Circle area. Letter <<<>>>

 

 4 June 14: Contact details of SSA wise Nodal Officers for EPF <<<>>>  

 

 4 June 14: SSA wise GSM Revenue Targets for year 2014-15 <<<>>>   

 

 3 June 14: SNEA (I) MH writes to Shri. M.K.Jain, CGMT Maharashtra Circle on recent arbitrary changes in Executive Transfer Policy and also register protest on act of management for giving misleading information about consent of SNEA(I) MH on such unethical and arbitrary changes even without preliminary discussions on two points in modified Executive Transfer Policy published on 23/05/2014. Copy <<<>>>

 

 3 June 14: At last, AGM (Staff) Mumbai issued orders for request transfers in SDE as well as DE Cadre from Tenure stations including SDEs/DEs completing tenure in Month of June 2014. SDE Order <<<>>>   DE Order <<<>>>

   This was one of the four important issues discussed in meeting of SNEA (I) MH with Shri. M.K.Jain, CGMT MH on Saturday 31/05/2013 wherein CGMT MH has assured to clear the files as and when received by him. SNEA (I) MH conveys him, sincere thanks for keeping word and hopes that he & his office will also keep word given for consideration of all request transfers from Non Tenure stations by end of this week.

 

 3 June 14: AGM (Staff) Mumbai issued all the request transfers specially & only to Pune SSA both in DE & SDE Cadre wherein 06 SDEs and 03 DEs are posted to Pune and substitutes will be posted after finalisation of Transfer Policy which is pending from management side.

 SDE Order <<<>>>   DE Order <<<>>>

   This is special gift to Pune SSA by Shri. M.K.Jain CGMT MH wherein he has served as PGMT Pune before taking over charge of CGMT MH Circle. SNEA (I) MH welcomes this move as Pune has special importance with respect to Revenue of BSNL and request CGMT MH for consideration of request transfers for all other such revenue earning SSAs in same tempo & spirit and in same Capacity of CGMT MH Circle.

 

2 June 14: Delegation of SNEA (I) had meeting with CGMT MH Circle on Saturday, 31/05/2014 to discuss arbitrary changes made by Circle management in transfer policy of executives. The details of discussions are being uploaded.

 

2 june 14: CWC Meeting at Jaipur: SNEA (I) MH delegation consisting of Com. A. R. Manani VP CHQ, Com. V.M. Wankhede AGS CHQ, Com. M.B. Sangale, JS (W) CHQ, Com. S.V.Bhad CP, CS, Com. S.P. Sonawane, CWCM, Com. R.S.Kolapkar, CWCM, Com. N.S. Gadre, CWCM and Com. M.P. Pandhare, CWCM attended two days CWC Meeting held at Jaipur on 26/05/2014 & 27/05/2014. Com. S.V.Bhad, CP SNEA (I) MH attended CWC Meeting in place of Com. S. C.Vete CWCM, who could not attend CWC Meeting as his father met with an accident just before leaving for CWC Jaipur Meeting.

Ø Schedule of CWC Meeting <<<>>>

Ø Report submitted by Com. K. Sebastin, GS CHQ <<<<>>>

Ø Issues of MH Comrades raised by CS SNEA (I) MH <<<>>>

Ø Important decisions taken in CWC Jaipur  <<<>>>

Ø Photos by Com. N.S. Gadre CWCM<<<>>>

 

2 june 14: AGM (Staff) Mumbai calls for three choice options from female SDEs unwilling for posting at tenure station for their posting at non tenure stations having vacant post of SDEs Letter <<<>>>

 

2 June 14: AGM (NWP CDMA) Mumbai issued orders for deloading of CDMA MSC at Nagpur w.e.f. 2100 hrs of 03/06/2014. Letter <<<>>>

 

2 June 14: Promotional offers of BSNL.  Letter <<<>>>     Data Card Offer <<<>>>

 

31 may 14: SNEA (I) MH whole heatedly Congratulates  Com. A.G. Paradkar, DGM (Elect) RTCC Nagpur,   Com. U.M. Kapadnis AD EB CRM Mumbai, Com. K.S.Fegade, DE Dombiwali, Kalyan SSA, Com. S.K. Dani, SDE (Udan) Nashik, Com. L.M. Vikhar, SDE (Comm) Amravati  on their superannuation retirement today & wish them and their  family members "A very Happy peaceful& Long Retired life”.

Com. K.S. Fegade, DE Ext Dombiwali, Kalyan SSA, {9423986868} has started his carrier as Clerk in Jalgaon SSA. Since 1993 he has served during DOT & BSNL period in different capacities of PI, SDE & DE in Kalyan SSA.  He is known for his cordial staff relations and sincerity and has shown his efficient skills in day to day functioning. Since beginning, he is very active member of SNEA (I) Kalyan and has taken active part in each and every activity of SNEA (I) Kalyan. 

Com. U.M. Kapadnis, AD EB CRM Mumbai{9423990003} has started his carrier as Clerk in Mumbai and on promotion he joined duties as PI in Goa SSA and thereafter served DoT as well as BSNL in different capacities of PI, JTO and presently he is serving as SDE EB CRM Mumbai. He is known for his hard work and sincerity in day to day working.

Com. S.K. Dani, SDE Udan Nashik {9423969037} has joined duties as Clerk in Nov 1975 at Manmad Nashik SSA & thereafter served as JTO, SDE in Nashik & Dhule SSA. He is die-hard member of SNEA (I) Nashik and has taken active part at each and every organizational activity of SNEA (I) Nashik. He is also well known for punctuality & is good orator and maintains very cordial relations with staff & officers.

Com. L.M. Vikhar, SDE Commercial Camp Amravati {9422917200} is efficient and well disciplined executive and active member of SNEA and was always involved in all programmes and functions of SNEA (I) with full devotion and dedication.

SNEA(I) MH salutes sincerity, dedication and affection Com. A. G. Paradkar, Com. U.M.Kapadnis, Com. S.K. Dani , Com. L. M. Vikhar towards BSNL and SNEA(I) and on behalf of all the Comrades of SNEA(I) MH wish them and their family members “A Happy, Peaceful & Long Retired Life”.

 

31 may 14: Congratulations to SNEA(I) Yavatmal: SNEA(I) MH congratulatesCom. N.S. Gadre, CWCM, Com. S.S. Bansod, DS SNEA(I) Yavatmal and entire team of SNEA(I) Yavatmal, for keeping the words & fulfilling the promise made by them during the preliminary preparation of CEC Yavatmal and contributing Rs. 1,25,777.00 for overall expenditure of CEC Yavatmal. Earlier team promised to contribute for Rs. 1, 00,000.00, but later on same has been increased and overall contribution of SNEA (I) Yavatmal in CEC Yavatmal is Rs. 1, 25,777.00. This is a great traditional move by SNEA (I) Yavatmal to strengthen the SNEA (I) MH by arranging the Spectacular CEC Meeting with their day night, sincere & dedicated efforts as well as financial contribution of Rs. 1, 25,777.00. SNEA (I) MH has no words for their appreciation & salutes the Strength & Unity of SNEA (I) Yavatmal. SNEA (I) MH conveys thanks to all the comrades of Yavatmal SSA for their huge contribution at different levels. Team SNEA (I) Yavatmal is known for making& keeping such promises and this time also the tradition maintained even though it was very difficult task for small branch like Yavatmal.  

 

31 may 14: DGM (HR/Admn) Mumbai issued guidelines for change of medical option with/without voucher through ERP. Letter   <<<>>> 

 

31 may 14: AD HRD Mumbai calls for VC of 41 DEs for DE Regular promotions DGM (HR/Admn) Mumbai latest by 05/06/2014. Letter   <<<>>>

 

31 may 14: CGM ALTTC Calls for volunteers for serving as Trainers/teachers in ALTTC Ghaziabad from executives in JTO& SDE cadre having M.Tech/MBA/Ph.D. qualification. Interested candidates ready to stay in ALTTC Campus in readily available Quarters for minimum period of five years, may apply directly to CGM ALTTC latest by 20/06/2014. Letter   <<<>>>  Format <<<>>>

 

31 may 14: Forum of BSNL Unions /Associations New Delhi congratulates Shri. Ravi Shankar Prasad, Hon MoC, on taking Over Charge as Minister of Communications , Govt of India and request for support for growth and strengthening of BSNL. Letter   <<<>>>

 

30 may 14: AGM (Staff) Mumbai issued list of 50 long stayed SDEs within Maharashtra Circles whose names will be considered as substitute for considering requests of SDEs presently working at All India Tenure Stations and applied for request transfer to Maharashtra Circle. Letter   <<<>>>

 

30 may 14: AGM (Staff) Mumbai issued guidelines for posting of executives within non tenure SSAs after transfer from tenure SSA, wherein it is clarified to give choice station and not choice posting on specific post. Letter   <<<>>>

 

30 may 14: CGMT MH writes reminder letter to SSA Heads for proper upkeep of Pillars & DPs and asks for its compliance by 07/06/2014. This time he stresses for removal of illegal posters on pillars and action for stopping posting of such postures on BSNL pillars. Letter   <<<>>>

 

30 may 14: AGM (Staff) Mumbai issued orders for bifurcation of Raigad SSA wherein the Staff & Officers working in Fountain TAX & Thane TAX presently reporting to GMT Raigad SSA will henceforth report to GM (Trans) Mumbai. Letter   <<<>>>

   This is good step by Circle management even though it may be taken with different interest, as it was difficult for Staff& Officers working in Mumbai to Report to Raigad SSA for day to day functioning and overall working of both the TAX Exchanges as it carries major revenue & networking works of BSNL Maharashtra Circle. This is third phase transformation as  both the TAX Exchanges  were earlier reporting to WTR, then its reporting changed to Raigad SSA & now it is changed to GM Trans at Circle Office Mumbai.  Even though such orders are not issued, with these changes automatically the SSA Head of Raigad will be DGM Level Officer and there may not be need of GM level Officer in Raigad SSA wherein no senior officer is interested for their posting and normally prefers to be in Mumbai area. 

 

 

NB: The information given on this site is restricted to SNEA (I) members only. The content of the pages of this site shall not be quoted or reproduced as an evidence elsewhere either in part or full for any purpose